Foster + Partners Unveils San Siro Replacement
By @sharedot · · 7 pages
- Style
- Architecture
Foster + Partners has unveiled the 71,500-seat, €1.2 billion Generali Stadium, a San Siro replacement set to open by Euro 2032.
A New Home for Milan's Two Clubs
Foster + Partners and US studio Manica have unveiled the design for Generali Stadium, a 71,500-seat venue for AC Milan and Inter Milan that will replace the 99-year-old San Siro.
The design was revealed at a gala event at Milan's Castello Sforzesco, where The Guardian reported some Inter fans protested outside, unfurling a banner reading 'you will never extinguish the lights at San Siro.'
The clubs paid €197 million to acquire the existing stadium and its parking areas, according to The Guardian, and Construction Review reports the wider redevelopment totals $2.56 billion (€2.3 billion). Work is set to begin in 2028, with the first match targeted for the 2031/32 season.
Why the Design Defies Expectations
Rather than starting with an icon, Manica founder David Manica told Dezeen the seating bowl was built around the experience of fans — specifically the 'curvas', the curved north and south stands that bring opposing supporters face to face.
'That relationship of two opposing walls of supporters, each tied to one of the city's great clubs, is unique to Milan and found in no other stadium in the world,' Manica said.
The north end will rise at a 37-degree pitch for 11,700 Inter fans, with the south end matching for AC Milan, Foster told Dezeen. The Guardian reports Manica said the seats 'could not be any closer' to the pitch, aiming to recreate the feeling of San Siro itself.
Structure and Sustainability Claims
Dezeen reports the stadium's defining feature is a pre-cast structural facade roughly 60 metres tall, composed of interlocking low-carbon concrete segments in an X-frame that supports the bowl and a double-curved roof.
Norman Foster called it 'a celebration of Milanese and Italian engineering tradition, where architecture and structure become one.' Construction Review also reports acoustic engineering aims to amplify crowd noise while reducing spillover.
High Stakes for a Landmark
The project follows years of contention: Dezeen reports Lombardy's heritage commission blocked a previous Populous design, 'The Cathedral,' in 2023 over San Siro's cultural significance, before Milan's city council approved the stadium's sale in October 2025 after an overnight debate lasting nearly 12 hours.
According to Construction Review, the wider scheme spans 281,000 square metres with hotels, offices and commercial space, and could require 1.5 million cubic metres of soil excavation and generate about 126,000 cubic metres of demolition debris — figures the outlet attributes to Italian reporting.
Environmental consultation published by the Municipality of Milan runs until November 1.
What Comes Next
The clubs expect construction to begin in 2028, with the stadium complete for the 2032 European Championship co-hosted by Italy — after which, according to Dezeen citing the BBC, San Siro will be demolished.
Construction Review notes the 2028 start differs from a July 2026 timetable in which authorities discussed beginning construction in the second half of 2027, though it says this does not establish a formal delay pending environmental approvals.
The clubs' feasibility study, cited by Construction Review, projects the completed development could be worth about $2.85 billion against $2.56 billion in expenditure. Foster + Partners is separately designing Manchester United's proposed 100,000-seat stadium, per both Dezeen and The Guardian.