Met Breaks Ground on Frida Escobedo's Tang Wing

The Metropolitan Museum of Art broke ground Tuesday on Frida Escobedo's five-story Tang Wing for modern and contemporary art, set to open in 2030.

@sharedot

Met Breaks Ground on Frida Escobedo's Tang Wing

By @sharedot · · 8 pages

  • Style
  • Architecture
  • Museums
  • The Met

The Metropolitan Museum of Art broke ground Tuesday on Frida Escobedo's five-story Tang Wing for modern and contemporary art, set to open in 2030.

What Happened

The Metropolitan Museum of Art celebrated the groundbreaking of its Oscar L. Tang and H.M. Agnes Hsu-Tang Wing for modern and contemporary art on Tuesday, September 15, 2026.

According to 6sqft, the five-story wing is designed by Mexico City-based architect Frida Escobedo, the first woman to design a wing at the museum in its 156-year history.

The Art Newspaper reports that the ceremony followed a breakfast reception in the museum's Carroll and Milton Petrie European Sculpture Court, drawing Met staff, trustees, local politicians, and neighbors, and closed with a performance by Swinomish/Iñupiaq singer-songwriter Black Belt Eagle Scout.

Why It's Surprising

The milestone is notable because a museum famously defined by its Beaux-Arts Fifth Avenue facade is opening itself physically to Central Park for the first time.

The Met's director Max Hollein told The Art Newspaper that "for the first time, the Met will open up to the park, open up to its neighbours," calling the wing the most ambitious expression of a museum in a moment of great transformation.

Escobedo, per ArtDependence, said the design weaves together the many architectural styles of the Met's campus while creating a space that is "distinctly of our time" — a striking claim for a wing replacing the Lila Acheson Wallace Wing within the existing footprint.

The Design

According to ArtDependence, the 126,000-square-foot wing includes 69,500 square feet of exhibition space — a nearly 50 percent increase — with gallery ceilings ranging from 11 to 22 feet.

Its defining feature is a limestone "celosía" facade, a latticed screen inspired by Mexican architecture and, as 6sqft notes, influenced by Arabic and North African traditions, responding to sunlight through the day.

Roughly 80 percent of the facade is solid, with 10 percent clear glass and 10 percent celosía-style stone screen, per 6sqft. The team includes executive architect Beyer Blinder Belle, Nelson Byrd Woltz Landscape Architects, and engineers Kohler Ronan and Thornton Tomasetti.

The Stakes

The project is the centerpiece of a larger Met transformation, and the money involved is substantial.

The Art Newspaper reports the museum has raised $670 million, covering full construction costs and part of a new operating endowment; the Tangs' $125 million gift is, according to that outlet, the largest cash donation in the museum's history.

6sqft describes the wing as the biggest project in a $1.5 billion transformation of the country's most visited museum.

Beyond galleries, the wing adds about 18,500 square feet of outdoor terraces, moves the Cantor Roof Garden to an expanded 10,000-square-foot fourth-floor space, and puts Central Park and skyline views on display year-round instead of seasonally.

Sustainability and Access

ArtDependence highlights that the wing targets major gains in accessibility and sustainability.

At least a quarter of the galleries in the existing wing have southern or western exposures that make them ill-suited for long-term art display and energy-hungry to climate-control; the new facade and window placement, along with a below-ground mechanical space, are designed to cut solar gain while maximizing natural light.

The wing will add two elevator cores, ramps, and clearer circulation, and the Central Park Conservancy will restore surrounding landscapes with accessible paths, new lighting, lawns, and trees.

The Art Newspaper also notes councilmember Gale Brewer's remark that the wing's large windows will be bird-friendly.

What Comes Next

The Tang Wing is expected to open in 2030, and it anchors a broader rollout of new and renovated spaces across the Met's campus.

According to 6sqft, the renovated Michael C. Rockefeller Wing opened in 2025 with 40,000 square feet devoted to sub-Saharan Africa, the ancient Americas, and Oceania; a new Costume Institute gallery off the Great Hall opened this year; and galleries for the art of ancient West Asia and ancient Cyprus will follow in 2027.

Escobedo, who called the Tang Wing the most ambitious project her studio has ever undertaken per The Art Newspaper, framed the groundbreaking as "la primera piedra" — not a beginning, but a transformation.

Sources

  1. 6sqft.com › The Met breaks ground on Frida Escobedo's new wing for modern and contemporary art
  2. theartnewspaper.com › Metropolitan Museum breaks ground on long-awaited new wing for Modern and contemporary art
  3. artdependence.com › The Metropolitan Museum of Art Breaks Ground on New Wing for Modern and Contemporary Art

More on Style